Every charger works with every vehicle—no exceptions.

NexBlue Point 2

Pay in full*

£498

Installation*

£395

Pay in full*

£498
Payments
NexBlue Point 2 (UK) is a high-performance wall-mounted single phase electric vehicle charger that operates up to 7.4kW charging power. Designed to provide a seamless charging experience for your electric vehicle, this charger is a must have for every eco-conscious driver.
Category:

Description

NexBlue Point 2 (UK) is a high-performance wall-mounted single phase electric vehicle charger that operates up to 7.4kW charging power. Designed to provide a seamless charging experience for your electric vehicle, this charger is a must have for every eco-conscious driver.
  • Local OCPP 1.6J and OCPP 2.0.1 allows future-proof integration

Features

  • Universal EV Compatibility: Works with all electric vehicles (EVs) and plug-in hybrids, providing flexible charging solutions for any vehicle.
  • Fast Charging: Offers charging power of up to 7.4kW, delivering rapid charging speeds for most UK households.
  • Smart Energy Tariff Integration: Compatible with popular UK EV tariffs such as Octopus Go, allowing for cost-effective off-peak charging.
  • Remote Control via App: Control your charging process remotely with Wi-Fi and 4G connectivity, using the NextBlue mobile app wherever you are.
  • Weatherproof & Durable Design: Built to withstand the UK’s unpredictable weather with an IP54 rating, impact-resistant, and designed to function in temperatures from -30°C to +50°C.
  • OZEV Grant Eligibility: Potential £350 government grant for eligible individuals and properties, reducing installation costs.

More Information

Additional information

Connection Type

Untethered

Colour

Black

Product FAQs

Q1. What types of electric vehicles are compatible with the NexBlue Point 2?
The NexBlue Point 2 is compatible with all electric vehicles (EVs) and plug-in hybrids, making it a versatile choice for most drivers.

Q2. How fast does the NexBlue Point 2 charge an EV?
The charger provides a charging speed of up to 7.4kW, which is the maximum rate for most UK homes, ensuring efficient and fast charging.

Q3. Can I choose the length of the charging cable?
Yes, the NexBlue Point 2 offers tethered cable options in 5m and 8m lengths, allowing you to choose the best fit for your parking space.

Q4. Is the NexBlue Point 2 compatible with smart energy tariffs?
Yes, it supports popular EV-specific tariffs like Octopus Go, which allows you to charge your EV at a lower cost during off-peak hours.

Q5. Can I control the charger remotely?
Absolutely! The charger is equipped with Wi-Fi and 4G connectivity, and you can control it remotely via the Cord AI app, no matter where you are.

Q6. Is the NexBlue Point 2 built to withstand outdoor conditions?
Yes, it is designed to be weather-resistant with an IP54 rating, and it operates efficiently in temperatures ranging from -30°C to +50°C, making it perfect for the UK's climate.

Q7. How long does it take to install the NexBlue Point 2?
Installation is typically completed within 2 weeks, and up to 15m of cabling is included, ensuring a smooth setup process.

Q8. Does the NexBlue Point 2 come with a warranty?
Yes, the NexBlue Point 2 comes with a 5-year warranty, providing extra peace of mind and security for your investment.

Q9. Is the NexBlue Point 2 eligible for any government grants?
Yes, you may qualify for a £350 government grant for eligible individuals and properties under the OZEV scheme.

Q10. What protection does the NexBlue Point 2 offer?
The NexBlue Point 2 comes with built-in surge protection, safeguarding your home’s electrical system from potential damage.

Installation FAQs

Q1: Do I need a survey before installation? Yes. Before we can book your EV charger installation, you must complete a home electrical survey. Q2: How long does the survey take? The online Jumptech survey usually takes 5 minutes to complete. Once submitted, our technical team will review your information and confirm whether your installation is standard or non-standard. Q3: What is a standard installation? A standard install typically includes:
  • Charger installed within ~15 metres of your consumer unit/electricity meter
  • No upgrades required to your existing electrical supply
  • Suitable WiFi or mobile signal for smart chargers
  • No groundworks or extended cable runs
If the survey identifies additional work, your installation may be classified as non-standard, and we’ll provide a tailored quote. Q4: Can I choose my installation date before completing the survey? No. The survey must be completed and approved first. This ensures we understand your setup, bring the correct materials, and send the right engineer for your installation. Q5: How long does installation take? A typical domestic installation takes around 2–4 hours. Non-standard installs may take longer depending on cable length, groundworks, or additional safety upgrades. Q6: Do I need to be at home during the installation? Yes, someone of 18 years or older must be present for:
  • Granting access
  • Agreeing the final charger position
  • Demonstration of the charger once installation is complete
Q7: Will you need to turn off my electricity? Yes. To work safely, the engineer will carry out an isolation at your main fuse, meaning the power wIll be off for a short period — usually 10–20 minutes. Q8: Will my home need any additional electrical work? It depends on the results of your survey. If required, we may need to:
  • Upgrade your consumer unit
  • Install new earthing or bonding
Q9: Do I need WiFi for the charger to work? Most smart chargers require either:
  • A reliable WiFi connection, or
  • A strong mobile data signal This allows features such as scheduling, load balancing, and usage monitoring to function properly.
Q10: What should I prepare before the installation?
  • Ensure the engineer has clear access to your consumer unit and intended charger location
  • Move any cars from the driveway
  • Make sure pets are kept safely away
  • Complete the Jumptech survey in advance
  • Have your charger (if supply-only) ready on site
Q11: Will you notify my DNO about the installation? Yes. We will handle any required notifications to the Distribution Network Operator (DNO) as part of the installation process. Q12: What happens after the installation is complete? Our engineer will:
  • Test the charger
  • Demonstrate how to use it
  • Provide guidance on the app setup
  • Complete certification and compliance documents These will be emailed to you shortly after the visit.
 

Leave a Reply

Your email address will not be published. Required fields are marked *

Leave a Reply

Your email address will not be published. Required fields are marked *

Share On:

0