Every charger works with every vehicle—no exceptions.

Cord Zero

  • Compatible with All EVs & Hybrids: Works with all electric vehicles and plug-in hybrids, ensuring effortless charging.

  • Fast Charging: Delivers up to 7.4kW charging speed, the maximum rate for most UK homes.

  • Tethered Cable Options: Choose between 5m or 8m built-in tethered cables for convenience and easy parking access.

  • Smart Energy Tariff Integration: Supports popular EV-specific tariffs like Octopus Go, allowing for cost-effective charging during off-peak hours.

  • Wi-Fi & 4G Connectivity: Stay connected and control your charger remotely via the Cord AI app, regardless of location.

  • Compact & Durable Design: IP65-rated, impact-resistant, and operates in temperatures from -30°C to +50°C, making it suitable for UK weather conditions.

  • Easy Installation: Standard installation typically completed within 2 weeks, with up to 15m of cabling included.

  • Surge Protection: Built-in protection to safeguard your home’s electrical system.

  • 5-Year Warranty: Free 5-year warranty upgrade (worth £75) for peace of mind.

  • OZEV Grant Eligibility: Potential £350 government grant available for qualifying individuals and properties.

SKU: N/A Category:

Description

  • Compatible with All EVs & Hybrids: Works with all electric vehicles and plug-in hybrids, ensuring effortless charging.

  • Fast Charging: Delivers up to 7.4kW charging speed, the maximum rate for most UK homes.

  • Tethered Cable Options: Choose between 5m or 8m built-in tethered cables for convenience and easy parking access.

  • Smart Energy Tariff Integration: Supports popular EV-specific tariffs like Octopus Go, allowing for cost-effective charging during off-peak hours.

  • Wi-Fi & 4G Connectivity: Stay connected and control your charger remotely via the Cord AI app, regardless of location.

  • Compact & Durable Design: IP65-rated, impact-resistant, and operates in temperatures from -30°C to +50°C, making it suitable for UK weather conditions.

  • Easy Installation: Standard installation typically completed within 2 weeks, with up to 15m of cabling included.

  • Surge Protection: Built-in protection to safeguard your home’s electrical system.

  • 5-Year Warranty: Free 5-year warranty upgrade (worth £75) for peace of mind.

  • OZEV Grant Eligibility: Potential £350 government grant available for qualifying individuals and properties.

Features

  • Compatible with All EVs & Hybrids: Works with all electric vehicles and plug-in hybrids, ensuring effortless charging.

  • Fast Charging: Delivers up to 7.4kW charging speed, the maximum rate for most UK homes.

  • Tethered Cable Options: Choose between 5m or 8m built-in tethered cables for convenience and easy parking access.

  • Smart Energy Tariff Integration: Supports popular EV-specific tariffs like Octopus Go, allowing for cost-effective charging during off-peak hours.

  • Wi-Fi & 4G Connectivity: Stay connected and control your charger remotely via the Cord AI app, regardless of location.

  • Compact & Durable Design: IP65-rated, impact-resistant, and operates in temperatures from -30°C to +50°C, making it suitable for UK weather conditions.

  • Easy Installation: Standard installation typically completed within 2 weeks, with up to 15m of cabling included.

  • Surge Protection: Built-in protection to safeguard your home’s electrical system.

  • 5-Year Warranty: Free 5-year warranty upgrade (worth £75) for peace of mind.

  • OZEV Grant Eligibility: Potential £350 government grant available for qualifying individuals and properties.

More Information

Additional information

Connection Type

Tethered

Colour

Black, White, Aluminium

Lead

5m, 8m

Product FAQs

Q1: Is the Cord Zero compatible with all EVs?

Yes, it is compatible with all electric vehicles and plug-in hybrids made since 2018.

Q2: What is the maximum charging speed of the Cord Zero?

The Cord Zero provides up to 7.4kW charging speed, which is the maximum for most UK homes.

Q3: Can I control the Cord Zero charger remotely?

Yes, with Wi-Fi and 4G connectivity, you can manage and monitor your charger remotely through the Cord AI app.

Q4: What is the warranty on the Cord Zero?

The Cord Zero comes with a 5-year warranty, providing extra protection and peace of mind.

Q5: How long does it take to install the Cord Zero?

Installation is typically completed within 2 weeks, with a quick and easy process managed by certified electricians.

Q6: Can I get a grant for the installation?

Yes, the Cord Zero is eligible for the OZEV £350 grant for qualifying renters and property owners.

Q7: Does the Cord Zero support solar panels?

Yes, the Cord Zero is solar-compatible and can be integrated with solar energy systems via the Cord app.

Installation FAQs

Q1: Do I need a survey before installation? Yes. Before we can book your EV charger installation, you must complete a home electrical survey. Q2: How long does the survey take? The online Jumptech survey usually takes 5 minutes to complete. Once submitted, our technical team will review your information and confirm whether your installation is standard or non-standard. Q3: What is a standard installation? A standard install typically includes:
  • Charger installed within ~15 metres of your consumer unit/electricity meter
  • No upgrades required to your existing electrical supply
  • Suitable WiFi or mobile signal for smart chargers
  • No groundworks or extended cable runs
If the survey identifies additional work, your installation may be classified as non-standard, and we’ll provide a tailored quote. Q4: Can I choose my installation date before completing the survey? No. The survey must be completed and approved first. This ensures we understand your setup, bring the correct materials, and send the right engineer for your installation. Q5: How long does installation take? A typical domestic installation takes around 2–4 hours. Non-standard installs may take longer depending on cable length, groundworks, or additional safety upgrades. Q6: Do I need to be at home during the installation? Yes, someone of 18 years or older must be present for:
  • Granting access
  • Agreeing the final charger position
  • Demonstration of the charger once installation is complete
Q7: Will you need to turn off my electricity? Yes. To work safely, the engineer will carry out an isolation at your main fuse, meaning the power wIll be off for a short period — usually 10–20 minutes. Q8: Will my home need any additional electrical work? It depends on the results of your survey. If required, we may need to:
  • Upgrade your consumer unit
  • Install new earthing or bonding
Q9: Do I need WiFi for the charger to work? Most smart chargers require either:
  • A reliable WiFi connection, or
  • A strong mobile data signal This allows features such as scheduling, load balancing, and usage monitoring to function properly.
Q10: What should I prepare before the installation?
  • Ensure the engineer has clear access to your consumer unit and intended charger location
  • Move any cars from the driveway
  • Make sure pets are kept safely away
  • Complete the Jumptech survey in advance
  • Have your charger (if supply-only) ready on site
Q11: Will you notify my DNO about the installation? Yes. We will handle any required notifications to the Distribution Network Operator (DNO) as part of the installation process. Q12: What happens after the installation is complete? Our engineer will:
  • Test the charger
  • Demonstrate how to use it
  • Provide guidance on the app setup
  • Complete certification and compliance documents These will be emailed to you shortly after the visit.
 

Leave a Reply

Your email address will not be published. Required fields are marked *

Leave a Reply

Your email address will not be published. Required fields are marked *

Share On:

0